McKenney’s and Turner Construction Company installed HVAC and plumbing systems for a four-story STEM research building on the University of Georgia’s main campus. The project’s scope included approximately 100,000 square feet of office and laboratory space and mechanical penthouse space on the fourth floor. The team had to ensure that the unique requirements of both space types were met, including … Read More
Black Rock – 10th Floor
The BlackRock 10th floor project is an interior build-out of commercial office space located at 725 Ponce de Leon Ave. NE, in Atlanta, Georgia. This 35,000 square foot build-out includes a lobby, a break room, large conference and meeting rooms, collaboration spaces, offices, and administrative support spaces. To support these spaces, terminal units, heat pumps, a new VRF split system, … Read More
Global Payments
Global Payments, a worldwide leading provider of payment technology and software solutions hired CA South LLC and McKenney’s to collaborate on this fast-paced, 150,000 square feet commercial office tenant upfit project in Alpharetta, Georgia. The project included changes to accommodate new office spaces and some open structure areas. To support and accommodate these spaces, modifications were made to interior air … Read More
3350 Peachtree
3350 Peachtree is located in the heart of Buckhead and directly adjacent to the Buckhead MARTA station. The 9-floor, 180,000-square-foot Class A office interior build-out project included mechanical and control systems. The project included multiple core restrooms, open office area renovations, and the full lobby build-out. To minimize disruptions to occupied work areas, McKenney’s project team adopted a strict phasing … Read More
Kysor Warren
McKenney’s assisted in designing and replacing 49 rooftop units in a 340,000-square-foot manufacturing facility in Columbus, Georgia. The installation included 280,000-square-foot high bay space used for light manufacturing; 60,000 of which is dedicated to administrative and office space.
BIM Keeps Project on Track
McKenney’s installed a highly complex HVAC system at the Riverside Epicenter multipurpose venue—a facility designed to serve its members and the community. THE CHALLENGE Installing a large, chilled water HVAC system to service this 107,000-square-foot facility consisting of a gym, bowling alley, auditorium, meeting and event center required meticulous planning and coordination. With multiple floor and ceiling elevations, significant duct work distribution … Read More
Delivering Out-of-the-Box Comfort
With detailed analysis and seamless collaboration, McKenney’s quickly installed an HVAC system in an upscale office space. THE CHALLENGE Looking to stand out during an extensive office renovation in one of Atlanta’s most historic and iconic buildings, the McKenney’s Interiors and Special Projects team performed a complicated HVAC installation in an area with exposed ceilings. They faced an aggressive schedule … Read More
Ally Center Build Presents New Challenges
The 26-story Ally Charlotte Center is a welcome addition to Uptown Charlotte’s skyline. Developed by Crescent Communities, Ally Charlotte Center features 750,000-square-feet of office space, approximately 30,000-square-feet of ground floor retail and restaurants, a 12,000-square-feet public plaza, a 1,400-space parking garage and a 380-key JW Marriott hotel with a rooftop pool. Ally Financial, the anchor tenant, envisioned an impressive Class-A tower to … Read More
Turning a Zoo Into an Oasis
McKenney’s installed life support systems (LSS), including plumbing, pipefitting, and controls, for the Zoo Atlanta Elephant Barn as part of the African Savanna exhibit expansion in Atlanta. THE CHALLENGE Zoo Atlanta tripled the size of its elephant habitat, tasking McKenney’s with managing LSS for the new exhibit. The McKenney’s team needed to perform most of the plumbing and pipefitting work underground while navigating around the … Read More
Barings Building
McKenney’s partnered with Balfour Beatty Construction to build a 25-story, high-rise office building and hotel tower in uptown Charlotte. This Class A, multi-purpose office tower, located adjacent to BB&T Ballpark, totals 638,000-square feet and spans the width of the entire city block. The building is anchored by a bank tenant occupying one-third of the building. Other tenants include the Kimpton Tryon Hotel … Read More