Grady 13th & 14th Floor

Andrea LaMont

Since opening in 1892, Grady Hospital has continued to grow and meet the medical needs of Georgians from performing Georgia’s first open-heart surgery in the 1920s to becoming one of the nation’s busiest Level I trauma centers. As part of the hospital’s evolution, the McKenney’s team was hired to complete renovations of the the13th floor C & D wings for … Read More

Black Rock – 10th Floor

Andrea LaMont

The BlackRock 10th floor project is an interior build-out of commercial office space located at 725 Ponce de Leon Ave. NE, in Atlanta, Georgia.  This 35,000 square foot build-out includes a lobby, a break room, large conference and meeting rooms, collaboration spaces, offices, and administrative support spaces. To support these spaces, terminal units, heat pumps, a new VRF split system, … Read More

Global Payments

Andrea LaMont

Global Payments, a worldwide leading provider of payment technology and software solutions hired CA South LLC and McKenney’s to collaborate on this fast-paced, 150,000 square feet commercial office tenant upfit project in Alpharetta, Georgia.    The project included changes to accommodate new office spaces and some open structure areas. To support and accommodate these spaces, modifications were made to interior air … Read More

1200 Peachtree Build-out

Andrea LaMont

1200 Peachtree is a Class A Office Building that features 370,000 square feet of office space and is located at 1200 Peachtree Street NE in the Midtown Atlanta neighborhood.   McKenney’s Interiors and Special Projects team partnered with HITT Contracting on a build-out project consisting of interior demolition,12 floors of HVAC renovations, plumbing systems, and replacement of chillers and cooling towers. … Read More

3350 Peachtree

Andrea LaMont

3350 Peachtree is located in the heart of Buckhead and directly adjacent to the Buckhead MARTA station. The 9-floor, 180,000-square-foot Class A office interior build-out project included mechanical and control systems.  The project included multiple core restrooms, open office area renovations, and the full lobby build-out. To minimize disruptions to occupied work areas, McKenney’s project team adopted a strict phasing … Read More

Two Legacy Union

Andrea LaMont

The McKenney’s team partnered with Gilbane Building Company and Shelco to deliver a design-assist core and shell project in downtown Charlotte. The 18-story, 412,000-square foot, Class A office building is attached to the 620 South Tryon Bank of America building. The project included multiple scopes of work, from early involvement preconstruction to coordination with the design team to mechanical installations, … Read More

Norfolk Southern Headquarters

Andrea LaMont

McKenney’s partnered with Holder Construction Company to build two office towers in downtown Atlanta. The 10 and 17-story buildings include a training facility, retail and conference spaces, a fitness center, daycare, and other mixed-use spaces on the lower floors. They will serve as the network operations center for Norfolk Rail Service. The project included multiple scopes of work, from preconstruction … Read More

Redesigned—Right on Schedule

Andrea LaMont

The McKenney’s team provided design-assist services and installed mechanical systems for a new member services contact center in Duluth, Georgia.  THE CHALLENGE  Everything about this major project was tight—the space and the schedule. The work area in the existing building was very dense, with minimal space for mechanical systems. The owner was counting on the team to complete the project … Read More

Fast Tracking Office Renovations

Andrea LaMont

McKenney’s completed an interior renovation on an upper floor of a commercial office tower in Atlanta, Georgia.  THE CHALLENGE  The team needed to renovate the HVAC system and make an existing break room functional for a tenant of this high-rise office building. Work on the 6,300-square-foot space had to be completed on a very tight timeline, with no room for inspection delays, … Read More

Amazon Atlanta

Andrea LaMont

Second-generation 24,680-square-foot interior build-out that included the demolition of existing HVAC systems and equipment. The project involved the installation of new HVAC controls systems, terminal units, ductwork, supplemental cooling systems and plumbing systems. A preconstruction survey was also used to test the basic operation and integrity of the equipment controls.