McKenney’s was hired by a mega Colocation Data Center Provider to perform work on a large data center project in Atlanta. The project was a fast-paced design-build installation that included five OFCI Vertiv XDU450s for the CDUs and an initial build-out for 24 racks with a capacity of up to 48. The five XDU450s are the very first installed in … Read More
Project Varsity
McKenney’s was hired as the design-assist mechanical and plumbing contractor to partner with Whiting-Turner Construction Company on a 14-floor office restack for the corporate offices of an American multinational corporation specializing in Internet-related services and products. The 14-floor office restack included common areas, office workspaces, a stand-alone kitchen and an innovation center. The McKenney’s team worked with the project architect … Read More
Making Room at VERO Biotech
McKenney’s expanded VERO Biotech’s production facility to significantly increase their manufacturing capacity and allow them to meet increased demand for nitric oxide in the healthcare industry. THE CHALLENGE VERO Biotech needed an extra 3,000 square feet of production space at their facility. Working within a demanding schedule, the McKenney’s team prevented dust infiltration into clean rooms and coordinated various trades … Read More
Black Rock – 10th Floor
The BlackRock 10th floor project is an interior build-out of commercial office space located at 725 Ponce de Leon Ave. NE, in Atlanta, Georgia. This 35,000 square foot build-out includes a lobby, a break room, large conference and meeting rooms, collaboration spaces, offices, and administrative support spaces. To support these spaces, terminal units, heat pumps, a new VRF split system, … Read More
Global Payments
Global Payments, a worldwide leading provider of payment technology and software solutions hired CA South LLC and McKenney’s to collaborate on this fast-paced, 150,000 square feet commercial office tenant upfit project in Alpharetta, Georgia. The project included changes to accommodate new office spaces and some open structure areas. To support and accommodate these spaces, modifications were made to interior air … Read More
Repurposing Groundwater, Creating Value
As a design/build mechanical contractor serving the southeast, McKenney’s was selected to partner with Greenstone Properties, Balfour Beatty Construction and various other subcontractors to build 14th and Spring, a Class “A+,” 12-story core and shell office building near the heart of Atlanta’s Midtown area. The building is located near a high-end hotel with numerous retail, dining, and cultural amenities. With … Read More
1200 Peachtree Build-out
1200 Peachtree is a Class A Office Building that features 370,000 square feet of office space and is located at 1200 Peachtree Street NE in the Midtown Atlanta neighborhood. McKenney’s Interiors and Special Projects team partnered with HITT Contracting on a build-out project consisting of interior demolition,12 floors of HVAC renovations, plumbing systems, and replacement of chillers and cooling towers. … Read More
3350 Peachtree
3350 Peachtree is located in the heart of Buckhead and directly adjacent to the Buckhead MARTA station. The 9-floor, 180,000-square-foot Class A office interior build-out project included mechanical and control systems. The project included multiple core restrooms, open office area renovations, and the full lobby build-out. To minimize disruptions to occupied work areas, McKenney’s project team adopted a strict phasing … Read More
Kysor Warren
McKenney’s assisted in designing and replacing 49 rooftop units in a 340,000-square-foot manufacturing facility in Columbus, Georgia. The installation included 280,000-square-foot high bay space used for light manufacturing; 60,000 of which is dedicated to administrative and office space.
An Efficient, Non-invasive Relocation
McKenney’s leveraged the collective strengths of three internal groups to fully design and install a system quickly and cost-effectively. THE CHALLENGE The McKenney’s team needed to install the HVAC system in the new location without disrupting ongoing patient services occurring next door. They had to work around a significant amount of existing below-floor plumbing in occupied spaces. In addition, a large … Read More