Download PDF
PROJECT HIGHLIGHTS
Award-Winning Water
Supply System Lowers
Usage and Costs
he Georgia Bureau of Investigation (GBI) headquarters in Decatur had been coping with high nonpotable water usage and costs to support systems fed by the county water supply. In fact, the GBI consumed 1,000,000 gallons
during a typical hot August. Hoping to reduce its water usage and its high costs, the GBI collaborated with McKenney’s to implement a more feasible, affordable and sustainable solution.

After several years of monitoring water usage and carefully analyzing the data, the GBI staff determined that they consumed an average of 370,000 gallons of water a month—costing
  $34,400 annually. From this information, they also developed a baseline meter reading for the winter months of just over 140,000 gallons per month. The source of the additional 230,000 gallons per month on average was then pinpointed —the cooling tower make-up water and irrigation systems.

To lessen county water usage, the GBI staff developed an innovative alternative water capture system and enlisted McKenney’s engineering expertise and capabilities to implement the system. It consisted of two cisterns with 10,000-gallon total storage capacity and an on-site well that pumps water to the cisterns. In addition, the system also tapped into condensate water from air handlers in the GBI’s Annex building and diverted rainwater from the building’s roof to the cisterns. McKenney’s also installed a pump, control valves and piping to the cisterns to distribute the stored water to the cooling tower make-up and irrigation systems.

With its new non-potable water supply system operating successfully, the GBI expects to achieve $20,000 in cost savings annually, which allows the system to pay for itself in just four years.
The content of this document is not intended as an endorsement.

For more information contact McKenney’s at 404-622-5000.
info@mckenneys.com     www.mckenneys.com
Project Team
  • Owner: Georgia Bureau of
    Investigation and CBRE, Inc.
  • Engineer: McKenney’s, Inc.
The Challenge
  • Calculate water usage
    and costs history
  • Pinpoint source of excesses
  • Devise supplemental
    water supply solution
The Solution
  • Dig an on-site well and
    install storage cisterns
  • Capture condensate and
    rainwater for cisterns
  • Pipe water from cisterns
    to cooling tower and
    irrigation systems
The Results
  • Cost savings of $20,000 annually
  • Project earned 2013 GASFA Innovation Award
  • System payback of four years
With such significant results—not only in cost savings but also reduced environmental impact—the project earned a 2013 Innovation Award from the Georgia Association of State Facilities Administrators (GASFA). It also paves the way for other state agencies with a high demand for non-potable water to enlist a similar solution to lower water use and costs, provided it has the infrastructure to support an on-site well and water storage system.
McKenney’s, Inc.   1056 Moreland Industrial Boulevard, Atlanta, Georgia 30316 Copyright © 2013 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.