Download PDF
Delivering for Pharma Giant
PROJECT NAME
  • Pharmaceutical
    Manufacturing Facility
PROJECT LOCATION
  • Covington, Georgia
PROJECT TEAM
  • Owner: Biopharmaceuticals
    Manufacturer
  • General Contractor:
    Fluor Corporation
  • Architect: Flad Architects
  • Engineers: AEI Corporation,
    CRB Consulting Engineers
  • Subcontractor: McKenney’s, Inc.
SPECIALIZATIONS
  • Building Information Modeling
  • Pipe Shop Prefab
MARKETS
  • Industrial
  • Central Plants
  • Science & Technology

cKenney’s completed a large-scale HVAC and plumbing installation at a new manufacturing plant on a 100-acre campus in Covington, Georgia.

THE CHALLENGE

From the outset, the owner had an aggressive timeline for completing its new campus to manufacture drugs for treating unusual diseases. Our team faced an immense project scope, a large number

of trade workers in a confined space, design changes, rigorous quality control requirements and the emergence of an outside main instrument valve vendor.

THE SOLUTION

To navigate design changes and meticulously track costs, McKenney’s held weekly—sometimes daily—meetings to identify the scope of changes, evaluate pricing and inform the owner of overages. Our quality control team

addressed onsite issues and procured a third party firm to ensure welding in our prefab pipe shop and field installations met the owner’s standards. For much of the project, all trades deployed two shifts along with extended work hours to stay on schedule.

THE RESULTS

Our attentiveness to detail kept the project on track and met the owner’s timeline and quality control standards.