Download PDF
Meeting Critical, Sensitive Needs
PROJECT NAME
  • Large Data Center
PROJECT LOCATION
  • Alpharetta, Georgia
PROJECT TEAM
  • Owner: Enterprise
    Data Center
  • General Contractor:
    Holder Construction
  • Engineer: Syska
    Hennessey Group
SPECIALIZATIONS
  • Plumbing Shop Prefab
  • Sheet Metal Shop Prefab
MARKETS
  • Mission Critical
  • Central Plants

cKenney’s completed a major data center upgrade— installing computer room air conditioning units, ductwork and plumbing in the uninterruptible power supply (UPS) and battery rooms—while maintaining 100 percent uptime.

THE CHALLENGE

Installation had to be completed in an active tier 4 data center in the UPS and Battery rooms. Existing systems had to

remain operational at all times. With no space for lay-down and material storage, all pipe fabrication had to be completed outside the building in order to adhere to the owner’s security standards.

THE SOLUTION

Piping was prefabricated off premises, which alleviated concerns about brazing fumes in the building and reduced crew size in tight areas. McKenney’s also developed detailed methods of procedure

and back-out plans for all critical work to ensure seamless operations and zero downtime.

THE RESULTS

Prefabrication and precise planning allowed the team to effectively manage and meet the project’s timeline. McKenney’s experience working in and around active data centers gave the owner confidence that the expansion wouldn’t interfere with critical operations.

404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214