Download PDF
An Efficient, Non-invasive Relocation
PROJECT NAME
  • Hospital Cardiology
    Department Relocation
PROJECT LOCATION
  • Atlanta, Georgia
PROJECT TEAM
  • Owner: Hospital
  • General Contractor:
    Segars Group, LLC
  • Architect: Demoss
    and Associates
  • Engineer: McKenney’s, Inc.
SPECIALIZATIONS
  • Design/Build
  • Plumbing Shop Prefab
  • Pipe Shop Prefab
  • Sheet Metal Shop Prefab
MARKETS
  • Healthcare

cKenney’s leveraged the collective strengths of three internal groups to fully design and install a system quickly and cost effectively.

THE CHALLENGE

The McKenney’s team needed to install the HVAC system in the new location without disrupting ongoing patient services occurring next door. They had to work around a significant amount of existing below-floor plumbing in occupied

spaces. In addition, a large stainless steel exhaust duct system had to be routed through multiple floors to the roof where the fan would be installed.

THE SOLUTION

Internal collaboration between the McKenney’s Engineering, Automation & Control Solutions and Healthcare teams eliminated the need for multiple contact points and created a seamless deliverable. By coordinating with the

architect and general contractor, optimal routing and installation methods minimized disruption of the patient care areas. McKenney’s previous knowledge of the facility, design/build capabilities and on-staff medical gas certified technicians ensured a smooth, successful relocation.

THE RESULTS

The HVAC system was installed without disrupting medical services, on time and under budget.

404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214