Download PDF
Expediting a Smooth Move
PROJECT NAME
  • Foodservice Packaging
    Manufacturer
PROJECT LOCATION
  • Norcross, Georgia
PROJECT TEAM
  • Owner: Manufacturer
  • General Contractor:
    The Conlan Company
  • Architect: Fowler Design
    Associates, Inc.
  • Engineer: AHA
    Consulting Engineers
  • Mechanical Contractor:
    McKenney’s, Inc.
SPECIALIZATIONS
  • Design/Build
  • Pipe Shop Prefab
MARKETS
  • Industrial
  • Central Plants

cKenney’s equipped a central plant and piped utilities to production lines for a food packaging manufacturer moving into a larger facility.

THE CHALLENGE

In a very short timeframe, the McKenney’s team had to build out the central plant and get every manufacturing line machine connected at the customer’s new

packaging plant. There was no time for pipe prefabrication at the McKenney’s corporate campus, and there were no drawings linking utilities to production line machines being moved from the customer’s old facility.

THE SOLUTION

To expedite the work, McKenney’s set up a fabrication shop on-site and drew spool sheets in the job trailer. To connect each machine, the foreman and project

manager visited the old facility several times to determine the utility needs for each production line.

THE RESULTS

The project was completed on time and under budget—exceeding the customer’s expectations. Pleased with the outcome, the owner decided to continue the relationship with McKenney’s on future projects.

404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214